There just be a huge demand out there right now for competent CM.
My company is providing the surveying for a big commercial park that has some 1/4 million sq ft cold storage warehouses being built. The lack of real management is making it a nightmare. No knowledge, they don’t have a schedule, no weekly meetings, nothing. No coordination or control over subs. Just pure chaos. They’ve poured footings in the wrong spots, moved the same dirt about 4 times, and have had some serious close calls with scraper traffic.
The PM is a well meaning kid but he’s a kid. Like 22 years old, just graduated college. This is his first job and he’s 1200 miles from the company’s home base, with zero support from anybody above him.
How does one define what competency in CM is?
I’ve already spent over an hour this morning on my weekend coordinating schedules with my radiant heat sub, talking through my plumber’s frustrations and concerns with his boss/partner’s way of approaching plumbing.
I have my framers onsite moving a chunk of wall with a 1200 lb window in it that the guy who the hired to prefabricate wall panels transposed numbers from the print and got the window three inches off center.
I took three days off my projects each of the last two weeks to do final punchlist/rework on another PM’s site because the subs are so frustrated with how picky the customer is they are not coming back to fix real issues they never should have left in the first place.
That includes over eight hours of laying on a staircase chiseling caulk off the hardwood stairs that should have never been caulked in the first place and trying to address crooked/wavy drywall that was caused by a framer not keeping his wall/floor joist connections flush. That same framer was fired from the job because he was subbing out the work to his friends and wasn’t paying them and keeping up with quality control.
Did I mention architects that will draw up a dream design costing tens and tens of thousands of dollars for a multi million dollar project and then allocate mechanical rooms smaller than the walk in closets beside them to accommodate mechanicals for 10,000 square feet? The same architect designed all of the structural steel and framing to be buried in the main floor which was also supposed to carry all HVAC ductwork, plumbing, electrical, radon, etc. in the same 18” deep floor trusses. Never mind the fact that there is full depth steel beams and glu-lam beams running diagonally inside those floors joists.
Competency and professional pride of excellence in craftsmanship in all areas of work seems to be in short supply while at the same time lack of awareness and appreciation of how difficult it actually is to bring a dream to reality is missing from a lot of customers.
I still don’t know what I want to be when I grow up.

However, I have subscribed to the theory of keeping what I enjoy to do personally separate from what I do professionally so I don’t ruin either. I would do that again.