We started the demolition of a bridge a couple of weeks ago, and I took a few pictures of one of the beams falling down. I think it is a pretty cool sequence. We have to completely demo this bridge and one just like it on the opposite side of the freeway and rebuild them and have them both open to traffic in 65 days.
This is a 5 span bridge and these pictures are of the 4th span as it is being dropped (or part of it anyways).
Here we go.
This is a 5 span bridge and these pictures are of the 4th span as it is being dropped (or part of it anyways).
Here we go.