After a short night got out to the blind and was greeted with a beautiful sunrise.
Again, a lot of activity with 12+ does and 3 or 4 bucks but nothing I wanted to shoot. So back to the cabin to work.
I’ve been wanting to finish the walls and ceiling of the bathroom for a long time but couldn’t until the mini split and exhaust fan was done. So priority 2 was getting that done. Exhaust fan went in relatively smoothly.
Got the condensation line hooked up on the mini split and the line set wrapped and the ceiling joist patched and am ready to put the ceiling in.
Well not quite ready. Had to get the pocket door installed then put the rest of the OSB on the wall, then put the shiplap paneling on the wall, THEN put the ceiling up.
All of that went pretty smoothly and before you know it, it was time for the ceiling. Still wasn’t 100% sure I could do it by myself but I was going to try. Thankfully it wasn’t a full sheet, 46 1/2”
X 83 1/2” and it had a nice cut out for the exhaust fan that I could use for a handle.
I had actually cut this sheet when the container was still at the house and test fitted it to make sure it would go in. But that was before I installed the toilet. It took quite a bit of maneuvering but I got it into place. It was a very tight fit which I think actually helped getting it installed by myself but I got it up and was able to get the first 2 screws in and it was easy from there.
Now came the headboard ceiling. This had been a challenge for me and my son working together at the house so wasn’t sure I could pull it off but was going to try. Got it cut and went to test fit it and again it too a lot of maneuvering to get it in place. So much so that I decided to put the adhesive on it while it was still laying there stuck on the shower on one side and the vanity on the other. Still wasn’t sure I was going to pull it off but figured I had a chance.
Was very liberal with the adhesive and using the correct kind that actually worked and was able to get the paneling slid onto a little gap where the shiplap paneling just barely helped hold it and thanks to the hole where the exhaust fan went and standing there holding it up against the ceiling with my head and one hand I was able to run the brad nailer with the other and got the first nails in it. Still not over but was able to move down a bit and repeat. Don’t think I could have done either the OSB or the beadboard without that hole for the exhaust fan being there to grab onto.
Lots of words for not much accomplished but I was very impressed with myself for actually getting it done.
Still a lot of trim and cleanup and paint to do but it got a lot closer to being finished.
Forgot that I only painted one side of the door with the spray gun.
Was able to go out for one more sit before going home and saw 20+ turkeys, and 3 decent bucks. I really am going to have to get up there during archery season because nearly all of them are broken in some form or fashion. One decent buck was a nice 5 on one side and just 2 on the other he was broken so bad.
Here’s the turkeys.
Thought about shooting one, think they were all toms and a couple were pretty big, but a .300 WSM probably wouldn’t be too friendly other than a head shot and again I had a lot to get done before going home and the only thing that would have sidetracked me would have been a really nice buck.