Bulldozers at Big Bend

Perlodid

Well-known member
Joined
Jun 14, 2017
Messages
283
Location
Washington
https://www.publicdomain.media/p/bulldozers-big-bend-border-wall

Since last week, activists have shared video footage that appeared to show heavy machinery laying the groundwork for new border infrastructure that Customs and Border Protection did not announce and initially denied was happening. By Thursday, photographer Natalie Newman captured video footage of bulldozers plowing earth at the mouth of the Santa Elena Canyon, an iconic and frequently visited stretch of the Rio Grande flanked by 1,500-foot cliffs.

Over the following months, the Trump administration’s plans for Big Bend constantly shifted. CBP first signaled in February that it planned to erect a 30-foot steel bollard wall across an area that is naturally obstructed by steep cliffs. Facing a sharp backlash from park users and locals, CBP walked those plans back, eventually publishing a more limited plan of about 200 miles of new patrol roads and four sections of non-contiguous vehicle barriers measuring about six feet tall and totaling 17 miles. The Department of Homeland Security (DHS) waived dozens of federal environmental and cultural protection laws to speed construction along.

At first, CBP publicly denied that the bulldozers had anything to do with its construction plans, issuing a statement last week that instead said the agency was re-grading roads damaged by heavy rains. CBP spokesperson John Mennell later backtracked, telling SF Gate that the bulldozers were turning up ground to assess the soil for construction. This week, CBP Commissioner Rodney Scott said more barriers and roads were needed to keep the park “free from fear of cartel activity.” Scott said the bulldozers were doing prep work for planned roads and vehicle barriers, but that construction had not started.

"What people are seeing right now is survey and design work–NOT construction of a wall through the park,” Scott said. “We are working to preserve the landscape and protect the access visitors and local businesses depend on.
 
Hmmm, I’ve never seen a bulldozer for a survey that’s usually a pickup and tripod
I think when they say surveys, they mean arch clearance, vegetation, wildlife, etc. They are probably using the dozer to get the pickup and people to perform these surveys in the area.
 
This is good but how much damage has already been done?
Sounds like very little outside of cleaning up some existing roads from recent storm damage and making access for the various surveys that will need to take place before any work can be done. But really at this point I have no idea.

 

Forum statistics

Threads
119,795
Messages
2,238,748
Members
39,012
Latest member
SX4LT
Back
Top