The battleship is in drydock being built

Hard part of plumbing is done. Got all the thru bulkhead work done, now can close up shower walls. All water lines are connected to gang drains and routed to their hookup points but havnt got primary or hotwater tank yet. . Things are picking up, need to order next batch of parts
20260123_163216~2.jpg20260125_132713.jpg
 
This is pretty badass. I might have missed it, but are you doing diesel heat again?
Yep, problem is i am having to change plans for them some. They don't make the 25mm 4 output units anymore so plumbing 3" ducts don't work as well for layout but I will figure it out. All the work for propane is only to run a 2 burner stove.
 
Yep, problem is i am having to change plans for them some. They don't make the 25mm 4 output units anymore so plumbing 3" ducts don't work as well for layout but I will figure it out. All the work for propane is only to run a 2 burner stove.
I like keeping the propane to a minimum. I used to stay in a little cabin on occasion with propane everything, including heat. It got a little spooky running a propane heater all the time when it was cold. I would have felt a lot better with a wood stove.
 
I like keeping the propane to a minimum. I used to stay in a little cabin on occasion with propane everything, including heat. It got a little spooky running a propane heater all the time when it was cold. I would have felt a lot better with a wood stove.
I hate propane, I have had so many issues with it over the years temps or altitude related . Plus, it's a terribly unefficient fuel source compared to diesel heaters.
 
Back
Top