Got to love big government bureaucracy! Looks like Alaska is moving the ball forward for your cause.
The US state of Alaska has adopted regulations to streamline the regulatory process for the siting of microreactors. The new regulations, which waive some requirements imposed on larger nuclear facilities, come into effect in August.;
www.world-nuclear-news.org
"The US Department of Air Force's preferred location to pilot its first microreactor is at the Eielson Airforce Base near Fairbanks. In September 2022, the department, in partnership with the Defense Logistics Agency Energy, issued a request for proposal for a microreactor to be built at the base. The reactor will be owned and operated by the contractor, and the US government will purchase its energy output via a long-term contract under a firm-fixed price. The system must be able to produce electricity and steam and to meet a baseload electricity demand of 5 MWe. The target is for the microreactor to be operational in 2027."
Any estimates on what this 5 MW powerhouse system is going to cost when and if it becomes operational in 2027? What will the long term fixed price electricity contract cost per kw?